Discovery Reveals Hidden Path? | The Curse of Oak Island

Original Media · 10m · English · YouTube · HISTORY

TLDR

LAR expert Pete Kelsece presents terrestrial LiDAR data for Oak Island lots 5 through 8, revealing a potential historical path connecting the lots. The team ground-truths the findings with metal detection, uncovering a 1750-1850 button and a pre-18th century rose head spike, suggesting a transport route linking the lot 5 stone foundation to the lot 8 boulder.

For you

PRO members can sign in and request more information — or their own version of this digest, tuned to what they care about.

Sign in to unlock

Surprising Insights

•

A pre-18th century rose head spike — used in mining shaft construction — was found on a surface path in the woods, not in a shaft or foundation.

•

The LiDAR data suggests a single continuous path linking four separate lots, implying large-scale coordinated earthworks across property boundaries long before the 1795 discovery.

Key takeaways

•

Terrestrial LiDAR (SLAM LAR) stripped of vegetation reveals a large arc and deep ditch on lot 5 that does not appear to be natural drainage, plus a berm continuing from lot 5 onto lot 6.

•

On lot 7, a feature extends from the end of a known stone wall, and on lot 8 a possible path leads toward the mysterious boulder previously excavated.

•

Steve overlaid the LAR data to trace a continuous path from lot 5 through lots 6 and 7 directly to the lot 8 boulder, creating a new search corridor.

•

Metal detecting along the predicted path yielded a single-loop button dated approximately 1750-1850 and a heavy square-shank rose head spike typical of 16th to early 18th century mining shaft construction.

•

The rose head spike found in the middle of the woods supports the hypothesis that a cart track or haul road once connected the lots, possibly used to move materials for the Money Pit or related structures.

•

The team now has a physical trail to follow with archaeological methods, aiming to recover more artifacts, build a timeline, and identify who built and used the path before 1795.

Notable quotes

“It sure looks like that right there has been worked. There appears to be a path.”

▸ Notable quotes · 2:34

“If there is this path from lot 5, where is it going? Where does it start? Where does it end? It's certainly worth exploring. There's no question about that.”

▸ Notable quotes · 2:52

“It might be a path. Looks like it could continue. Yeah, I can see that pretty clearly.”

▸ Notable quotes · 4:09

“You're connecting a path around lot 5 to a path heading to a mysterious feature on lot 8. And it gives us a whole new area to search.”

▸ Notable quotes · 4:33

“That loop. It's pretty big, isn't it? Is that — Yeah, it is. Bigger than loop. It's normally an older style. If I was guessing, I'd say 1750, 1850.”

▸ Notable quotes · 6:43

“Could potentially be a rose spike. That is a really old square shank fastener. And it's out here in the middle of nowhere.”

▸ Notable quotes · 8:04

Chapters

•

0:01 — LAR Survey Presentation: Pete Kelsece presents terrestrial LiDAR data for lots 5-8, showing 300,000 points per second stripped of vegetation to reveal ground disturbances.

•

2:01 — Lot 5 Anomalies: A large arc and deep ditch crossing it appear worked, not natural, with a possible path connecting to the known stone foundation.

•

3:10 — Lots 6-8 Features: A berm continues from lot 5 to 6; lot 7 shows a feature off a known wall; lot 8 reveals a possible path toward the excavated boulder.

•

4:16 — Path Correlation: Pete and the team connect the dots: a continuous path may run from lot 5 through 8, linking the foundation to the boulder.

•

5:23 — Ground-Truthing the Path: The team metal-detects along the predicted path from lot 5 toward lot 8 to find artifacts proving its existence and age.

•

6:10 — Button Discovery: A single-loop button dated ~1750-1850 is found at the path's starting point on lot 5.

•

7:51 — Rose Head Spike Find: A heavy pre-18th century rose head spike — used in mining shafts — is recovered along the path, suggesting heavy transport.

Speakers

•

Pete Kelsece — LAR Expert

•

Rick Lagina — Team Co-Leader

•

Marty Lagina — Team Co-Leader

•

Craig Tester — Team Member

•

Gary Drayton — Metal Detection Specialist

•

Steve Guptill — Data Analyst / GIS

⋮